Thursday, December 20, 2007

Project Activity Sequencing Outputs

Project activity sequencing consists of the methods and tools used to set the stage for the most efficient and trouble-free project plan. Project activity sequencing has several outputs, including the project network diagram and activity lists.

The project network diagram
One output that results from activity sequencing is the project network diagram. This diagram may be produced manually or on a computer.

The project network diagram includes full project details, including clear, concise, self-explanatory names for all project activities.

Full project details include "hammock activities" as well. For example, an auto parts manufacturer inspects all the parts it produces. Rather than repeat the inspect activity in the project network diagram, the manufacturing company rolls all inspection into a single summary or hammock activity.

Overall start and finish dates are then associated with the single hammock activity. One or more summary or hammock activities often make up part of full project details.

The project network diagram includes a summary narrative. The summary narrative outlines the basic activity sequencing approach used in the network. The summary narrative provides details about the use of dependencies, sequencing assumptions and leads and lags.

The summary narrative outlines how dependencies are included in the project, how outside dependencies will be handled, and which dependencies are mandatory or optional.

The summary narrative also includes assumptions about sequencing. It may be assumed, for example, that testing can start after 25 percent of development has taken place.

In addition to assumption, the summary narrative outlines how leads and lags will be handled. In a finish-to-start relationship, an activity with a lead of five days may start five days before its predecessor has finished. An activity with a lag of five days cannot start until five days after its predecessor activity has finished.

Finally, the project network diagram contains a description of unusual sequencing. Unusual sequences occur in a network to allow for things like client preferences or specific resource availability. For example, in setting up a computer network, it may seem logical to configure the servers before configuring the workstations. The customer, however, may stipulate that employees are to begin training and work on their workstations immediately. As a result, the configure workstations activity takes place in the project network diagram before the configure servers activity.

Activity list updates
The second output from activity sequencing is activity list updates. Network diagram preparation may reveal instances where an activity must be divided or redefined in order to diagram the correct relationships.

As an example, consider the initial activity list for installing a computer network. Attempts to construct a network for this project reveal that there is overlap between the build and test activities. Computer tower components must be tested at intermediary intervals.

If the build and test activities have been defined at too high a level, the sequencing diagram may not show this overlap. The solution is to break the build and test activities down into their component parts, and indicate their dependencies on other activities. Based on this, a new project network diagram can be constructed.

The outputs from activity sequencing are the project network diagram and the activity list. These two outputs are important components in the creation of the project schedule. The project network diagram reflects project activities and their dependencies. After initially diagramming the network, the activity list may remain the same or change based on the diagram.

Saturday, December 8, 2007

The Inputs of Project Activity Sequencing

To successfully plan a project, you have to arrive at an appropriate sequence for the project activities. This process, called "activity sequencing" requires that you identify the inputs of project activity sequencing.

There are a number of inputs that influence project activity sequencing, including: the activity list, product description, mandatory dependencies, discretionary dependencies, external dependencies, and milestones.
  • the activity list
    The activity list is a complete list of all project activities. These activities need to be analyzed and organized into a workable sequence so that the project can be completed in an optimal time frame.

    If, for example, a computer and data services company is building a network, the deliverables might be decomposed into the following activities:

    - configure mail server
    - configure application server
    - configure file server
    - configure print server
    - configure work stations
    - configure the router
    - connect hub
    - run cabling
    - test network

    This activity list must now be analyzed for dependencies and organized for completion.
  • product description
    The second factor that influences activity sequencing is the product description. The product description documents the characteristics of the product or service that the project was undertaken to create. Product characteristics affect activity sequencing. These effects are apparent in the activity list. A review of the product description helps ensure project accuracy.

    Consider the example of the computer and data services company that is building a network. Suppose that a review of the product description indicates that the client only requested the configured servers, a configured router, and cabling. The client plans to have in-house technical support connect the hub, run the cabling, and test the network once it is in place.

    As a result of reviewing the product description, the computer and data services company supplying the network identifies an inaccuracy in its activity list. A revision of the list and resequencing of activities are necessary.
  • mandatory dependencies
    The third, fourth, and fifth factors that affect activity sequencing fall under the heading of dependencies. The three types of dependencies that affect activity sequencing are mandatory, discretionary, and external.

    A mandatory dependency is one that is inherent in the nature of the work being done. Also known as hard logic, this dependency involves physical limitations.

    Take a look at a mandatory dependency in the context of building a computer network. The activities include configuring the network components, running cabling, and testing the network. One mandatory dependency that exists is between the test network activity and the rest of the project activities.

    The test network activity can't be done until the network is in place. This means that all other activities must be completed first. There is a mandatory dependency between the test network activity and all other activities associated with this project.
  • discretionary dependencies
    Also known as preferred, preferential, or soft logic, this dependency is defined by the project management team based on established practices in an application area or a specific desired sequence.

    In the example of building a computer network, a discretionary dependency may exist. The client company wants its employees to begin working as soon as possible. To meet with this requirement, the project management team decides that configuring the workstations should be the first activity in the sequence.

    Other activities could replace this activity as the first in the project. In this case, however, the project management team decides that configuring the workstations is the preferred starting point.
  • external dependencies
    An external dependency is one that involves a relationship between project and non-project activities. To understand this type of dependency, consider again, the example of building a network. The computer and data services company purchases some of its network components from a supplier. This creates an external dependency. The computer and data services company can't provide its service until it has all the parts it requires. Purchasing components from a supplier is an example of an external dependency.
  • milestones
    Milestones are the final input of activity sequencing. Milestones are significant events or stages in the development of a project. Some examples of common project milestones are:

    - initial research
    - concept development
    - design completion
    - prototype development
    - quality testing
    - final acceptance

    Milestones act as control points in long projects that have several work packages and smaller tasks. For example, the computer and data services company grouped the project deliverables to identify major project milestones. The milestones for the network project are: finalizing the product description; installing and configuring network hardware components; and testing network capabilities.

    Milestones need to be an input to activity sequencing to assure that the project meets all of the necessary requirements. It is important to identify milestones so that you can effectively measure the progress of your project.
Optimizing the sequence of project activities can help you to avoid costly delays and rework. When sequencing, you need to consider your activity list, product description, dependencies and milestones. By factoring these inputs into the sequencing equation, you will arrive at a more logical sequence, one that will allow you to sail through project development and implementation with fewer surprises and mistakes.